Key points for construction, installation, and use of polyethylene road substrate
2026-02-05
1. Rapid laying process Ground cleaning: Remove sharp stones and weeds, level the ground (without hardening) Plate splicing: Align and splice according to the card slot, reserve 2-3cm expansion joint (to cope with temperature changes) Edge fixation: Use sandbags or steel nails to fix the edge plates to prevent displacement Acceptance passage: Check the firmness of the joints to carry heavy equipment for passage 2. Use and maintenance Avoid direct impact of sharp objects on the board surface to prevent scratches Regularly clean the surface oil and soil to maintain anti slip performance Avoid direct sunlight during long-term storage, which can extend the service life Can be reused 5-8 times, and can be recycled and reprocessed after scrapping